Guidelines for Installation
The InRow RD provides reliable, accurate temperature control of computer rooms, laboratories, and other 
environments that require close tolerance control. The unit incorporates the latest system design innovations to 
provide you with optimum efficiency, reliability, and accuracy of control.
The InRow RD unit will provide years of trouble-free service when installed and maintained by 
technically qualified personnel. For more detailed information, see the appropriate InRow RD 
Installation manual:
ACRD100 series: 990-3211
ACRD200 series: 990-3213
ACRD500 series: 990-3235
Room preparation
During the design of the room, consideration should be given to the following factors: ease of entry for 
the system, floor-loading factors, and accessibility of piping and wiring.
The room must be sealed with a vapor barrier to minimize moisture infiltration. Polyethylene film 
(plastic sheeting) is a good vapor barrier for ceiling and wall applications. Rubber- or plastic-based 
paints should be applied to concrete floors and walls. The room should be thoroughly insulated to 
minimize thermal loads and make-up air (if required) should be preconditioned to reduce additional 
temperature, filtration, and moisture loads.
Service access
For routine service while in the row, at least 914.4 mm (36 in) of clear space must be left in the front and 
rear of the unit. To move the equipment outside the row for service, an area of 1219 mm (48 in) of clear 
space is required.
Receiving the unit
Your InRow RD unit has been completely tested and inspected prior to shipment. To ensure that you 
have received the unit in excellent condition, perform a careful inspection of the crating and the unit 
immediately upon receipt. Verify that all parts ordered were received as specified and that the unit is the 
correct size and voltage necessary to fulfill your environmental control needs. Report any damage 
discovered to the freight carrier. If necessary, contact the APC field service department for help in 
repairing or replacing damaged parts. While APC is not responsible for damage incurred in transit, we 
want to make sure that you have no undue delays in your system start-up. See the unpacking sheet and 
installation manual for more information.
Rigging
The unit is manufactured with a formed steel frame for maximum strength and unit integrity. However, 
as with all electrical and mechanical equipment, you must take care with proper rigging of your unit.
When using a forklift to move the unit, use the shipping skid to protect the bottom of the unit. When 
using chains, cables, or rope to lift the unit, use spreader bars to prevent damage to the finished panels. 
Four threaded M10X16 holes are provided in the top of the frame to accommodate lifting eye bolts that 
can be utilized to lift the unit.
Condensate drain
Condensation from the evaporator pan is collected and discharged by the condensate pump to a 
condensate line supplied with the unit. Additional condensate piping is required to route to the building 
condensate system.
Note:
 
Because of an ongoing program dedicated to product improvement, specifications are 
subject to revisions without notice. APC assumes no responsibility, and disclaims all liability 
for damages resulting from use of this information or for any errors or omissions.