Hubbell CR User Manual

Page of 25
 
 
13
Outlet to floor drain                       Install into provided tapping 
 
 
 
 
 
 
 
 
 
Manual Release 
 
Lever 
 
 
 
 
 
 
 
                          Temperature and Pressure Relief Valve 
 
4.  Install a relief valve overflow pipe to a nearby floor drain. CAUTION: No valve of any type 
should be installed between the relief valve and tank or in the drain line.  
 
FILLING THE HEATER 
 
1.  Completely close the drain valve and open the highest hot water valve to allow all air to 
escape from piping. 
 
2.  Open the valve to the cold water inlet and allow the heater and piping system to completely 
fill, as indicated by a steady flow of water from the open faucet.  
 
ELECTRICAL INSTALLATION 
 
1.  Enter electric enclosure with properly sized feeder leads (use 60° C copper wire for water 
heaters rated less than 100 amps; otherwise use 75°C copper wire). Single-phase installations 
require two (2) leads; three phase installations require three (3) leads.  
 
2.  Install these power leads into the box lugs on the terminal block or magnetic contactor. 
 
3.  Torque screws per torque chart included in Section VI.  
 
4.  All other electrical connections are made at the factory; therefore, no other electrical 
connections are necessary. 
 
FINAL CHECKS 
 
1.  Check all connections for tightness. 
 
2.  Ensure that all the above steps are completed. 
 
3.  After the water is heated for the first time, monitor the water temperature as described in 
Section III, Quarterly Inspection. 
Temperature Probe 
Temperature Probe