HP Performance Optimized Data Center (POD) 240a Quick Setup Guide

Page of 39
 
Site requirements  14 
 
IMPORTANT:
  To provide power to the HP POD 240e NA, external transformers and 
switchboards might be required. This equipment must be designed and installed to adhere with 
local, state, and national codes, and installed by contractors with licensing required by the local 
jurisdiction; city, township, and state. 
  
For all site preparation drawings, see the HP Site Preparation Drawing Package (on page 
). 
 
Site electrical system 
To be sure that there is a complete and safe integration of the HP POD solution within your facility, HP 
requires that you complete the following actions for the installed electrical system before the installation of the 
HP POD solution: 
 
Short circuit analysis 
 
Arc flash study 
 
Circuit breaker coordination study 
These actions must be performed for all associated parts of the electrical power train. The majority of the 
details and factors required to complete these studies are associated with the existing installed facility 
infrastructure. 
  
 
CAUTION: 
 Failure to complete these studies can cause serious issues with the electrical 
integration of the POD into your electrical system. 
  
 
Electrical power system configuration 
A preliminary meeting with the HP POD Electrical Engineering team is necessary to discuss your decision 
concerning capacity limitations and the impacts of this decision on the electrical design. 
When determining the final location of the power connections, consider the following: 
 
Distance between the facility utilities and the location of the HP POD 240e NA 
 
Distance between possible UPS or generator locations and the HP POD 240e NA 
 
Requirements for routing electrical feeders (underground or overhead) 
The facility power connection must be installed in compliance with local electrical codes and regulations. The 
HP reference electrical installation design is based on a maximum distance of 15.2 m (50 ft) or a line of sight 
between the disconnect and the HP POD 240e NA. You are required to discuss your decision concerning 
capacity limitations, and the impacts of this decision, on the electrical design with the POD Electrical 
Engineering Team. 
A 1N electrical configuration can be achieved by providing all of the required electrical feeders from a 
common power source, common switchboards, and transformers. 
A 2N electrical configuration can be achieved by feeding parallel power paths from independent power 
sources, switchboards, and transformers. 
  
 
IMPORTANT:
  All 3-phase wye feeders for the HP POD 240e NA require that the neutrals and the 
equipment grounding conductors remain isolated. Bonding of the two conductors is allowed at 
the power source only.