HP Performance Optimized Data Center (POD) 240a Quick Setup Guide

Page of 39
 
Index  38 
A 
areas prone to lightning or power surges   21 
assembly area   23 
B 
before you contact HP   31 
BSMI notice   33 
C 
capacities   6 
cold aisle clearance   10 
cold weather considerations   21 
connection portals   16 
contacting HP   31 
D 
demarcation box   18 
dimensions   7 
drain location   13 
E 
electrical   13 
environmental considerations   21 
environmental control system (ECS)   16 
environmental risks   21 
F 
facility connections   16 
fire and safety   19 
fire box   18 
fire detection   6 
future expansions   9 
G 
grounding requirements   10 
H 
HP contact information   31 
HP site preparation drawing package   22 
J 
Japanese notice   33 
L 
Locations for the HP POD 240e NA and 
equipment   23 
M 
modifications, FCC notice   33 
O 
Other structures   24 
overview   5 
P 
power   13 
pre-delivery   28 
preparing for assembly   28 
project coordination   22 
R 
regulatory compliance identification numbers   33 
regulatory compliance notices   32, 33 
regulatory compliance, HP POD 240e NA   32 
S 
safety and NEC compliance   5 
safety considerations   33 
safety information   33 
seismic activity   21 
site assessment   22, 25 
site planning considerations   23 
site preparation   6 
site readiness checklist   28 
site requirements   7, 22 
site safety and security   6 
supported facility connections   16 
Index