Honeywell VCR DCP200 User Manual

Page of 184
DCP200 Profile Controller & Recorder - Product Manual
Page 16
Installation
51-52-25-150, Issue 1 – April 2009
Instruments may be mounted side-by-side in a multiple installation, but instrument to panel 
moisture and dust sealing will be compromised. Allow a 20mm gap above, below and behind 
the instrument for ventilation. The cut-out width (for instruments) is:
(96- 4) mm or (3.78- 0.16) inches
If panel sealing must be maintained, mount each instrument into an individual cut-out with 
6mm or more clearance between the edges of the holes.
Note:
The mounting clamp tongues may engage the ratchets either on the sides or the 
top/bottom faces of the Instrument housing. When installing several Instruments side-by-
side in one cut-out, use the ratchets on the top/bottom faces.
CAUTION:
Ensure the inside of the panel remains within the instrument operating temperature 
and that there is adequate airflow to prevent overheating.
Gasket
Mounting Panel
Clamp
Ratchets
Instrument 
Housing
Slide mounting clamp over 
the instrument housing 
towards rear face of 
mounting panel until the 
tongues engage in ratchets 
and instrument is clamped in 
position.
Hold instrument firmly in 
position (apply pressure to 
bezel only)
Figure 2. Panel-Mounting the instrument
CAUTION:
Do not remove the panel gasket, as this may result in inadequate clamping and 
sealing of the instrument to the panel.
Once the instrument is installed in its mounting panel, it may be subsequently removed from 
it’s housing, if necessary, as described in the Fitting and Removing Option Modules section.
Cleaning
Clean the front panel by washing with warm soapy water and dry immediately If the USB 
option is fitted, close the USB port cover before cleaning.