Honeywell Musical Instrument WT6500 User Manual

Page of 46
Turbine Installation
HONEYWELL™ Wind Turbine WT6500 Owner’s Manual - Rev 10
comparative data for a region or a specific location. However, be very careful when 
relying only on this information as such data quite often tends to be measured at 
very high altitudes and may not be useful at lower and more practical heights. 
2.  As a general rule it is best to install the turbine at the highest permissible position 
and far removed in proximity to trees and other adjacent buildings or structures. 
3.  Always take into consideration all possible safety consequences of the turbine 
installation at the local site.  
Figure 2.2  Wind Map for USA
There are several options for the installation of the 
HONEYWELL™ Wind Turbine.  
The turbine may be installed using a pole, a 
QUADPOD™ Mount on a flat roof with a 
ballast or a 
QUADPOD™ Mount on a pitched roof with a ROOFBOX™ Mount. These 
are described in the next section. 
Building codes and installation requirements vary considerably between various 
townships, cities, states and countries. Make sure that all required local permits are 
obtained BEFORE beginning installation. In all cases installation must be conducted 
by a licensed and trained professional contractor and electrician. In some locations the 
local electric utility may have strict regulations about renewable energy technologies 
such as this wind turbine and other interconnect agreements and therefore it is highly 
recommended that they are also contacted BEFORE installation.