Hach sc1000 User Manual

Page of 150
51
Section 4
System Start Up
Important Note: During initial commissioning, make sure all plug-in expansion cards, 
expansion modules, and all probes are correctly connected and wired in the system.
1. Supply power to the controller. When the LED light turns green, the display module 
and the attached devices are communicating.
2. Follow the touch screen calibration prompts. After the touch screen calibration is 
complete the operating system starts and the display automatically prompts for the 
user language, time and date. 
Note: Touch screen calibration is required for each user. Calibrating the system to a stylus will 
prevent the need for multiple operator calibrations. The initial touch screen calibration is stored 
in the display module. To change the touch screen calibration, switch the display module on and 
off. Press the screen during start-up to display the touch screen calibration mode.
3. Select the appropriate language and time and date settings. 
4. Switch the display module off and on.
5. Confirm the attached probes and devices.
6. Press 
OK
7. The controller automatically scans for connected probes. The scan may take several 
minutes to complete.
For more information on using the display module, refer to