GE Surface Time-Saving Wellheads Brochure

Page of 2
GE © 2010. All rights reserved.
10/13, PC #12-0300
geoilandgas.com/pressurecontrol
Multi-Bowl Wellhead System
295-5649
Multi-Bowl Experience —
 
• North Morecambe Bay
 
– First multi-bowl system with NT-2 connections and 
MS-1 seal technology
 
• South Texas tubingless multi-bowl system
 
– 10,000 psi, 350ºF system
 
– Speed drilling competition
 
– Saved 5% of total well cost
 
• World record water depth
 
– Platform multi-bowl system
 
• Industry’s first true 18-3⁄4” 10M single-stack multi-bowl 
system
 
• First 18-3⁄4” surface MS700 application system
 
• First 21-1⁄4” surface MS700 system
MB233 with ESP