Escient MP-100 User Manual

Page of 161
P
AGE
 21
F
IRE
B
ALL
-MP I
NSTALLATION
 & U
SER
S
 G
UIDE
 - M22002-01A1
C
HAPTER
 2 - S
ETTING
 U
P
 F
IRE
B
ALL
-MP
2
Since no two people are likely to 
have the same exact audio or video 
configuration, the steps involved in 
putting the FireBall-MP system together 
are not specific to any one piece of 
audio or video equipment. Therefore, it 
may be necessary for you to customize 
one or more of the cables that are 
included with this equipment. Please 
see Appendix A for a cable pin-out 
configuration guide.
Depending upon the intricacy of the 
audio and video equipment and the 
access to each component, installation 
should take approximately 2-4 hours.
Unpack The Equipment
u
         Carefully unpack all of the FireBall-MP equipment from the shipping container.  
v
         Next, compare it to the following list and make sure you have everything 
available before you get started.
• 
FireBall-MP unit packed in plastic bag
• 
Escient 48 button remote control with 2 AA batteries
• 
Detachable A/C Power Cord - 6'
• 
S-Video cable (Y-C) - 5'
• 
Composite Video cable - 5'
• 
Dual RCA cable - 5'
• 
User/Installation Manual
• 
Open Me First Guide
• 
Thank You Card
• 
Ethernet cable - 10'