Epson BrightLink Pro 1410Wi Meeting Room Productivity Tool with Wall Mount Installation Guide

Page of 140
9
English
Touch Unit
The following parts are packaged with your projector and are necessary when attaching the Touch Unit. When 
installing the Touch Unit on a non-magnetic surface, you will also need three M4 screws.
Control Pad
The following parts are packaged with your projector and are necessary when attaching the Control Pad. 
When installing the Control Pad on a wall, you will also need four M4 × 20 mm screws.
Tape (approx. 2.4 inches 
[6 cm]) for securing the 
markers (×12)
Label (×4)
Touch Unit and markers
(markers are inside the unit)
Touch Unit connection cable
Infrared deflector (approx.
11.2 inches [28.5 cm]) (×8)
Spacer for screw hole (×3)
AA size batteries (× 2)
Port protection
stickers
Control Pad
Rubber feet