Furuno SC-60 User Manual

Page of 106
2. INSTALLATION 
 
 
 
2-16
2.5 Wiring 
This section covers general wiring. For further details see the interconnection 
diagram at the back of this manual. 
DISPLAY UNIT
SC-602
PROCESSOR UNIT
SC-601/SC-601-D
DGPS
ANTENNA
GR-800-1-S
*
           12-24 VDC
ANTENNA UNIT
SC-303
MJ-A7SPF0006-100,
10m
TPPX6-3D2V-15M, 15m
TNC-PS-3D (15 m)
MJ-A3SPF0013-035,
3.5 m
 
General wiring diagram 
• 
The display cable (display and processor units) is 10 m long. Connect it to the 
DISPLAY port on the processor unit. 
• 
The antenna cable is 15 meters (standard length). Connect the three coaxial 
cables to the processor unit according to cable color as below. Incorrect 
connection will result in wrong heading. 
Antenna TPPX6-3D2V-15M 
Port on 
Processor Unit 
Antenna Element 1 No color 
GPS ANT 1 
Antenna Element 2 Yellow 
GPS ANT 2 
Antenna Element 3 Red 
GPS ANT 3 
Note 1:
 Instead of TPPX6-3D2V, three Japan Industrial Standard coaxial cables 
3D2V (local supply) or equivalent can be used as antenna cables. 
Core
f
0.96 mm
Sheath
Shield
Insulator T1.02 mm
3D2V
50 
W
f
5.3 mm
 
Sectional view of coaxial cable 3D2V