FireplaceXtrordinair 36 DV EFIII User Manual

Page of 52
1 8
Installation  
(for qualified installers only)
Travis Industries
4040708
1 0 0 - 0 1 1 6 0
Vent Installation
In addition to the requirements below, follow the requirements provided with the vent.
Use a firestop whenever 
passing through a ceiling
Vertical Termination 
Use a roof flashing and storm collar 
whenever passing through the roof
Use a support box 
on exposed vent
Vertical Vent 
Requirements
Use a firestop whenever 
passing through a wall 
Horizontal Termination
Maintain a minimum 1" clearance (2" in 
some cases - see "Clearances") from 
vent to any combustible
Minimum 
Framing for 
wall thimble 
Horizontal Vent 
Requirements
Minimum framing 
for fire stop
Maintain a minimum 1" 
clearance from vent to 
any combustible
8-5/8"
or
10"
8-5/8"
or
10"
Slide the vent sections together and turn 1/4 turn until the sections lock in
place.
Screws are not required to secure the vent.  However, three screws may be
used to secure vent sections together if desired.
High temperature sealant is recommended at the appliance starter section
connection (use high-temperature silicone or Mill-Pac®).
If disassembly is required, at time of re-assembly check to see if the vent
creates a tight fit.  If it does not, apply high temperature sealant to the joints of
the affected sections.
Horizontal sections require a 1/4" rise every 12" of travel
Horizontal sections require non-combustible support every three feet (e.g.: plumbing tape)