Cabletron Systems EMM-E6 User Manual

Page of 64
Chapter 3: Installation
3-10
EMM-E6 Installation Guide
3.5
CONNECTING TO THE NETWORK
This section gives procedures for connecting the EMM-E6 and various 
EPIMs to the network. Refer to the list below and follow the procedures 
in the subsection for appropriate module type:
3.5.1
Connecting a 10BASE-T Segment to an EPIM-T
Before connecting a segment to the EPIM-T, check each end of the 
segment to determine wire crossover. If the wires do not cross over, use 
the switch on the EPIM-T to internally cross over the RJ45 port. Refer to 
Figure 3-5 to properly set the EPIM-T crossover switch.
NOTE
For proper operation, the EPIM-T module to be configured for 
use in the EMM-E6 module must be of EPIM board revision 04 
or greater. Board revision numbers are found following the part 
number printed on the Printed Circuit Board of the EPIM.
NOTE
To establish a link, you must have an odd number of 
crossovers (preferably one) between 10BASE-T devices of the 
same type (i.e., from repeater to repeater or transceiver to 
transceiver).
ICH1Book  Page 10  Tuesday, August 6, 1996  3:06 PM