Atlas LS 16 User Manual

Page of 10
English 6
6HUYLFHVFKHGXOHV
A poorly maintained Cut-off Saw is a haz-
ard. Doing regular maintenance and lubri-
cation jobs as listed in these schedules will
help keep the Cut-off Saw in a safe work-
ing condition.
Apart from the daily jobs, the schedules
are based on the operation hours of the
Cut-off Saw. Keep a regular check of
hours in use. Do not use a Cut-off Saw
that is due for regular service. Rectify any
defects found during regular maintenance
before clearing the Cut-off Saw for use
Daily
1.
Clean the Cut-off Saw in general
2.
Check hoses and fittings for cracks
or leaks. Replace if necessary
3.
Check for damages
Note: Check tightness of nuts, bolts,
screws and hose fittings after the
first days of operation and thereafter
in accordance with the maintenance
schedule
Every 3 months
1.
Do the daily jobs
2.
Check tightness of nuts, bolts,
screws and hose fittings
Every 300 hours or every year
1.
Do the daily jobs and jobs every 3
months
2.
Check the moving parts, disc, seals
and bolts for wear and cracks.
Replace if necessary
3.
Check the function of the Cut-off
Saw
6FUDSSLQJDQGZDVWHGLVSRVDO
Used and worn out parts must be treated
and disposed of in such a way that the
greatest possible part of them can be re-
cycled and the influence on the environ-
ment kept as low as possible.
WARNING
Maintenance must be done only by
suitably qualified and competent
persons.
Before doing any maintenance,
make sure that the Cut-off Saw is
safe and correctly sited on level
ground.
WARNING
Fine jets of hydraulic oil at high
pressure can penetrate the skin. Do
not use your fingers to check for
hydraulic oil leaks. Do not put your
face close to suspected leaks. Hold
a piece of cardboard close to sus-
pected leaks and then inspect the
cardboard for signs of hydraulic oil.
If hydraulic oil penetrates your skin,
get medical help quickly.