AMX CB-TP12 Leaflet

Page of 2
Installation Guide
CB-TP12 
Rough-In Box for 12" Wall/Flush Mount Touch Panels
Overview
The procedures outlined in this document apply to the 1200V-and 1200VG-
Series of touch panels. 
Wall Mount panels (NXDs) are contained within a metallic outer housing (back 
box). This back box is not removed when installing the NXD into a CB-TP12 
Rough-In Box. The back box is only removed to gain access for the replacement 
of the Compact Flash component or upgrade to the VESA housing.
The CB-TP12 Rough-In Boxes are optional metallic boxes that are secured onto 
stud beams prior to the installation of a solid surface. Installation procedures and 
configurations can vary. 
Specifications 
WARNING: INSTALLER, LEAVE A GAP BETWEEN THE STUD AND ROUGH-
IN BOX TO ACCOMMODATE THE DRYWALL/SHEETROCK. 
This gap allows the installation of the drywall/sheetrock after the Rough-In Box 
has been installed.
Note: The most important thing to remember when mounting this Rough-In Box 
is that the mounting tabs must be mounted flush against the outside of the 
sheetrock. 
Pre-Wall Installation of the CB-TP12 Rough-In Box
1.
Fasten the CB-TP12 to a stud through the stud fastening holes, located on 
the inside of the Rough-In Box (FIG. 1), by using either nails or screws. 
2.
Remove any necessary wiring knockouts from the Rough-In Box (C in 
FIG. 2) where the necessary cables are threaded through for connection to 
the touch panel.
3.
Thread the incoming RJ-45, Ethernet, and any other audio/video wiring 
through the knockouts. 
4.
Install the drywall/sheetrock before inserting the main NXD unit into the 
CB-TP12.
Installing a 12" NXD panel within a Rough-In Box
The Rough-In Box must be mounted prior to continuing this section. Verify that 
all necessary cables have been threaded through the knockouts on the Rough-In 
Box and the connections have been tested prior to installation of the touch panel.
1.
Remove the magnetic faceplate/bezel (A in FIG. 2) from the main NXD unit 
(B in FIG. 2) by gripping the faceplate and pulling with gentle outward force. 
2.
Verify the incoming RJ-45, Ethernet, USB, and any other audio/video 
cables have been properly threaded through the wiring knockouts (from 
their terminal locations) on the Rough-In Box. Leave enough slack in the 
wiring to accommodate any re-positioning of the panel.
3.
Connect all data and power wiring connectors to their corresponding loca-
tions along the side of the (un-powered) NXD touch panel. 
• Verify the terminal end of the power cable is not connected to a power
 supply before plugging in the 2-pin power connector.
• The USB connectors can be from either a USB extension cable, or 
 a wireless USB RF transmitter.
Note: Don’t disconnect the connectors from the touch panel. The unit must be 
installed with the attached connectors before being inserted into the Rough-In 
Box.
4.
Test the incoming wiring by connecting the panel connections to their 
terminal locations and applying power. Verify the panel is receiving power 
and functioning properly to prevent repetition of the installation.
5.
Disconnect the terminal end of the power cable from the connected PSN 
power supply.
6.
Carefully slide the main NXD unit (B in FIG. 2) into the Rough-In Box, so 
the Mounting Tab lies flush against the Rough-In Box (C in FIG. 2).
7.
Insert and secure the four securing #4-40 Mounting Screws into their 
corresponding holes located along the sides of the NXD. 
8.
Replace the magnet faceplate (A in FIG. 2) back onto the main NXD unit. 
Make sure to align the Microphone, Light, and PIR Motion sensor locations 
to their respective openings on the front bezel/faceplate.
9.
Connect the terminal RJ-45, Ethernet, and any optional audio/video wiring 
to their respective locations (outside the Rough-In Box) on either the AVB 
breakout box, Ethernet port, or NetLinx Master. 
10. Reconnect the terminal power connector on the PSN and apply power
    
CB-TP12 (FG031-10) Specifications
 Dimensions (HWD) • 11.52" x 11.60" x 3.50"
• 29.27 cm x 29.47 cm x 8.89 cm
Included 
Accessories
Rough-In Box Installation Kit (SA2001-02) (one kit per CB)
• 4 Phillips pan-head (#4-40 x 0.375 Black) screws (80-0115)
• 4 Phillips pan-head (#4-40 x 0.625 Black) screws (80-0118)
Certifications
• cTUVus Listed
FIG. 1  
Screw locations for Rough-In Box attachment in a pre-wall installation
Drywall/
Stud
Knockouts should be located on the left-side of the
CB-TP12 Rough-In Box
Rough-In Box, alongside the connectors
Stud fastening holes
Use the four #4-40
Mounting Screws to 
secure the NXD to the 
Rough-In Box at these
sheetrock
Mounting tabs
for NXD panel should
be flush with the outside of the sheetrock
locations