AMS DCB-274 User Manual

Page of 72
ADVANCED MICRO SYSTEMS, INC.   
SMC-27X2 SOFTWARE
 
5 2  
The controller will remain in an idle state for the specified time. The Wait command, if issued while indexing 
(as a result of an R, +, -, or F command), timing will NOT start until the motion has completed.  
 
NV default =0   
 
The following example program pre-energizes the controller to the run current then makes a move. 
P 0 
Enter program mode. 
w 25 
Pre-energize the controller for 250 milliseconds. 
+ 1000 
Move 1000 steps in the plus direction. 
 
P 0 
Exit program mode. 
 
Function 
Type 
NV Bytes 
Examine Settings 
Immediate 
N/A 
Command 
 
 
Mnemonic 
 
Data 1 
 
None 
Data 2 
 
None 
Result 
Display 
Setting 
 
X (Examine) 
The Examine command produces two different responses, depending on the mode of operation. When NOT 
in the multi-axis mo de (non-daisy chain or party line) the display is as follows: 
 
X    K= 5/5, I= 400, V= 5016, D= 1, ½, n=C 
 
Where: 
 
K= Ramp up/ramp down 
 
I= Initial velocity 
 
V= Slew velocity 
 
D= Divide factor 
 
½= Resolution mode 
 
n= Axis name 
 
In the multi-axis (daisy chain or party line) mode the data is returned in the following format: 
 
mm[LF] 
mm= model (26) 
 
Function 
Type 
NV Bytes 
Program Hold and Run Current 
Default, Immediate, Program 
Command 
 
 
Mnemonic 
 
(Name) Y 
Data 1 
 
Hold 0-100 
Data 2 
 
Run 0-100 
Result 
 
 
 
 
 
(Y) Hold and Run Current 
This command allows specifying the Hold and Run values of motor current (per phase) between 0 and 100% 
with a resolution of 1%. The value 100% represents a maximum of 4 amps per phase. The switching between 
Hold and Run values is automatic whenever a motion function is executed. Current reduction to the "Hold" 
value is automatic and occurs when stationary. A settling time (nominally 1 second) is inserted after each 
move is completed. 
 
The maximum current is limited to a value that will not consume more than the 100VA and is available from 
your power supply.