ADIC SNC 5100 User Manual

Page of 228
Fibre Channel MAP
63
6-00020-02
SNC 5100
Examine Cables
Caution
If in this procedure, you need to remove or replace the Fibre 
Channel cable, you must stop I/O at the Fibre Channel host.
Step 1.
Remove the cables.
Step 2.
If any cables are obviously damaged, replace them. 
Step 3.
Use dusting spray/compressed gas to dust off optical connectors on 
the GBIC and cable ends.
Step 4.
Reconnect the cables.
Step 5.
Perform Health Check. 
For more information, see “Perform Health Check” on page 46.
Step 6.
View the event log at viewing level 3.
Step 7.
If errors are gone, exit this MAP.
If errors persist, go to 
.
Fibre Channel Loop Back Test
Caution
Before performing diagnostics, the Fibre Channel cables must be 
removed from the SNC 5100. All I/O to the SNC 5100 must be 
stopped.
Step 1.
Attach a Fibre Channel loop back plug to the Fibre Channel port.
Step 2.
If the front-panel FC Connection Status LED is not on, replace the 
SNC 5100. 
For more information, see Figure 4 on page 14.