Installation 
Connecting the Servers:
Step 1: 
Connect all servers to the primary and secondary KVM switches.  
Refer to the “Connecting Servers to the PRO3 KVM Switch” section on 
page 16 for instructions.
Step 2: 
Power up the secondary KVM switches sequentially, beginning with the highest 
BANK, by connecting each unit’s power supply. Each KVM switch should display 
its corresponding BANK-address number as it is powered up.
Step 3:
Power up the primary switch. You should see the primary KVM switch light up 
and display the digits “00”, indicating its BANK address.
Note: If the PRO3 KVM Switches do not enumerate correctly, reset the primary 
KVM switch (BANK 00) by simultaneously pressing the “BANK +” and 
“BANK –” buttons. You can also reset the primary KVM switch to detect newly 
added secondary KVM switches. If the KVM switches still do not enumerate 
correctly, check that all KVM switches have the correct BANK address assigned 
to them and that all daisy-chain cables are connected properly.
Step 4: 
Verify that the primary KVM switch has detected all secondary KVM switches 
by scrolling through the BANKs using the “BANK +” and “BANK –” buttons. 
If all secondary KVM switches are detected properly, the LED display on the 
primary KVM switch will register and display the BANK address of the attached 
secondary KVM switch.