Belkin AP51300fc10-BLK User Manual

Page of 138
B
elkin 
Pur
eA
Hybrid 
A
VU1500 
UP
S
22
®
®
Setup and Installation
There is always an air of excitement to quickly set up and use new 
products. Of course, we’re glad you are excited about your AVU1500, but 
rushing the setup could actually waste more time and cause frustration. 
Give yourself time and go through the setup procedure methodically to 
stay in control, improve setup accuracy, and ensure satisfaction when you 
are finished.
Setup involves these basic steps:
Step
Approximate 
Time
Tools and Notes
1.  Prepare
10 min.
2. Charge Battery
12 hours 
max
Battery must charge before 
using unit
3. Plan
20–30 min.
Power planner worksheet 
(included on page 23)
4. Install
10 min. 
if rack-
mounting
If rack-mounting, you will need 
the included front rack-mount 
brackets, the Belkin PureAV  
Rack-Mount Rail Kit (part 
number AP00001—sold 
separately), and a Phillips-head 
screwdriver. Note: Screws for 
mounting the AVU1500 to the 
equipment rack itself are not 
provided as they are made 
specifically for the particular 
equipment rack that you own. 
Contact the rack manufacturer 
if you do not have the correct 
mounting screws.
5. Program
5–10 min.
6. Connect Cables
15–20 min.
Cable labels (included), 
additional coaxial cables, cable 
management “stuff” (e.g.,  
twist-ties).
7. Test Your Setup
5 min.