Belkin AP51300fc10-BLK User Manual

Page of 138
B
elkin 
Pur
eA
Hybrid 
A
VU1500 
UP
S
25
Setup and Installation
Power Planning:
Now, begin planning which device should connect to which AVU1500 power 
outlet. Here is a sample planner:
Shutdown 
Stage:
Stage 3
Stage 2 
Stage 1
Filter Bank:
A - digital
B - analog
C - analog
D – high 
current
Switched vs. 
Always On?
Always on
Switched 
no delay
Always on
Switched 
10 sec. 
delay
Outlets
DVR
Projection  
TV
VCR
Preamp
Amplifier
Outlets
Satellite 
box
PC
Tape  
player
Game 
console
DVD
DVD
Use the empty planner below to assign your home theater components to 
your AVU1500 power outlets (write in pencil) and decide if the associated 
filter banks will be “always on” or “switched”.
Shutdown Stage:
Stage 3
Stage 2
Stage 1
Filter Bank:
A - digital
– analog
C - digital
D – high 
current
Switched vs. 
Always On? 
Outlets
Outlets
Considerations and Suggestions
As you begin to assign devices to power outlets, you may find yourself 
having to move and reassign items a bit based on various considerations. 
This is to be expected.
   Amplifiers and subwoofers: Assign these to Stage 1 Filter  
Bank D outlets.
  •   These components draw a lot of power and in the event of a blackout, 
they should be shut off first to conserve battery-backup power.
  •   These components should be “switched” with a delayed power-on for 
about 10 or 15 seconds.