Weil-McLain Standing Pilot Cast Iron Gas Boiler CGA25SPDN User Manual

Page of 68
Part Number 550-101-009/0107
33
GOLD CGa Gas-Fired Water Boiler — Boiler Manual
Installation and service certificate
"OILER
-EASURED
)NSTALLER
)NSTALLERS
Check-out procedure — checklist
7
O
"OILER
O
!UTOMATIC
O
!IR
O
!IR
O
#ORRECTLY
4ABLE
page 12 to check size and fuel type.
#ORRECTLY
Failure to do so will cause severe personal in-
jury, death or substantial property damage.
O
Followed lighting/operating instructions on boiler or in 
manual Section 

 or Section 

O
0ROPER
#HECK
manual Section 
D
.
O
Test limit control — While burners are operating, move 
indicator on limit control below actual boiler water tem-
PERATURE
to operate. Raise setting on limit control above boiler water 
temperature and burners should reignite.
O
Test additional field-installed controls — If boiler has a low 
water cutoff, additional high limit or other controls, test for 
OPERATION
operating and should go off when controls are tested. When 
controls are restored, burners should reignite.
O
"UTTON
O
Test ignition system safety device:
a. 
3TANDING
 — Turn gas cock knob to 
0),/4
posi-
tion and extinguish pilot flame. Pilot gas flow should 
stop in less than 3 minutes. Put system back into op-
eration (see Section 

).
b. 
3PARK IGNITED
side of gas valve. Start boiler, allowing for normal 
start-up cycle to occur and main burners to ignite. 
With main burners on, manually shut off gas supply 
AT
off. Open manual main shutoff gas valve. Manometer 
should confirm there is no gas flow. Pilot will relight, 
flame sensing element will sense pilot flame and main 
burners reignite.
O
Set limit control(s) to system temperature requirements. 
Adjust balancing valves and controls to provide design 
temperature to system.
O
For multiple zones, adjust flow so it is about the same in 
each zone.
O
6ERIFY
ERLY
&IELD
, manual Section 
5
, page 27, 
4HERMOSTATS
.
O
#YCLE
verify boiler goes through normal start-up cycle. Lower to 
lowest setting and verify boiler goes off.
O
Measure natural gas input:
a. 
Operate boiler 10 minutes.
b. 
Turn off other appliances.
c. 
At natural gas meter, measure time (in seconds) re-
quired to use one cubic foot of gas.
D
#ALCULATE
 
3600 x 1000
number of seconds from step c
=   Btuh
E
"TUH
boiler rating label.
O
#HECK
downstream test tapping on main gas valve. Manifold pres-
sure for natural gas should be 3.5" w.c. and for propane gas 
should be 10" w.c.
O
Observe several operating cycles for proper operation.
O
Set room thermostat to desired room temperature.
O
&ILL
O
Review all instructions shipped with this boiler with owner 
or maintenance person. Return instructions to envelope 
and give to owner or place in pocket inside front panel in 
boiler.
O
O
O
O