Sharp Digital Signage Software Viewer PNSV01 User Manual

Page of 117
87
Schedule Distribution Tool
11. If you selected the “Distribute now” option button in step 
7, a screen like the one on the right will appear. Check 
that the distribution was successful and click [Close].
  If you selected the “Distribute at specified date time” 
option button in step 7, a screen like the one on the right 
will appear. Click [OK].
 • Schedule and program distribution may take some time. If you perform simultaneous distribution to
multiple panels, data is actually sent sequentially. For this reason, there may be some time difference in
schedule and program distribution.
 
• Old schedules are no longer required after new schedules have been sent. Unnecessary schedules and
their associated content will be automatically deleted the next time Client Scheduler starts.
●Distributing to your own PC
  These instructions only apply to the Standalone Version.
1.  Click [Distribute schedule or program to the panel].
The [Selection of Distribution Methods] dialog box will appear.
2.  Select the “Distribute the schedule to your PC (My 
computer)” option button, and click [Next]. 
The [Selection the Schedule to Distribute] dialog box will
appear.
3.  Select a schedule.
If you want to add the selected schedule to the current open 
schedule on your PC, check the “Add this schedule on the
running schedule in the target panel” check box. If the box is
not checked, the currently open schedule on your PC will be
replaced with the currently selected schedule.
4.  Click [Next].
A [Confirmation] dialog box will appear.
Distributing schedules