Trion Air Compressor 147207-001 User Manual

Page of 30
TABLE OF CONTENTS
SECTION I DESIGN
For The System Design Engineer
      
                 Page
1. Introduction ................................................................................................................................ 1
2. General Description ................................................................................................................... 1
3. System Design and Layout........................................................................................................ 2
SECTION II INSTALLATION
For The Installing Contractor
1. Unpack and Inspect ................................................................................................................... 3
2. Position Air Cleaner Cabinet ..................................................................................................... 3
3. Connect Adjoining Ductwork .................................................................................................... 3
4. Mount Detergent System ........................................................................................................... 3
5. Connect Drain............................................................................................................................. 3
6. Connect Wash Water Supply..................................................................................................... 3
7. Mount Control............................................................................................................................. 4
8. Complete Wiring
A. High Voltage Wiring................................................................................................................ 4
B. Primary Wiring ........................................................................................................................ 4
9. Fire Suppression System (when factory supplied).................................................................. 4
10. Checkout for System Start-up .................................................................................................. 4
SECTION III OPERATION AND SERVICE
For The Maintenance Engineer
1. Introduction and Principle of Operation ................................................................................... 5
2. Initial Start-up ............................................................................................................................. 6
3. Wash Control and Detergent System Settings......................................................................... 8
4. Routine Maintenance ................................................................................................................. 9
5. Preventative Maintenance ......................................................................................................... 9
SECTION IV TROUBLESHOOTING
For The Maintenance Engineer
1. Trouble Shooting ..................................................................................................................... 11
2. Spare Parts ............................................................................................................................... 12
3. Trouble Reference Chart ......................................................................................................... 13
SECTION V REFERENCE
Illustrations and Drawings
Figure 1
General Component Arrangement...................................................... 14
Figure 2
Unit Outline .......................................................................................... 15
Figure 3
Control Outline..................................................................................... 16
Figure 4
Detergent System Outline ................................................................... 17
Figure 5
Piping Schematic................................................................................. 18
Figure 6
Field Wiring Diagram........................................................................... 19
Figure 6a
Second Wash Section Field Wiring Diagram ................................... 19a
Figure 7
Fire Control System Outline................................................................ 20
Figure 8
ATS Control Schematic Page 1........................................................... 21
Figure 9
ATS Control Schematic Page 2........................................................... 22
Figure 10
AIR BOSS Control Schematic Page 1................................................. 23
Figure 11
AIR BOSS Control Schematic Page 2................................................. 24
Figure 12
ATS Remote Box Schematic Page 1................................................... 25
Figure 13
ATS Remote Box Schematic Page 2................................................... 26
Figure 14
Standard Single Section Sequence Timing ....................................... 27