The Allstar Standby Power Supply is designed to provide back-
up power to a gate operator when the main AC supply voltage is 
interrupted or disconnected.  It eliminates the need for a separate 
motor and control circuit to be mechanically attached to the gate 
operator.  The SPS-50 will provide the power and a signal to the 
gate operator to open the gate and leave it open until the main 
power is restored.  Once the main power is restored, the SPS-50 
will provide a signal to the gate operator and the operator will 
close (if a timer to close is used).  It is not designed to 
continuously cycle the gate operator.  Many local building codes 
require this type open only back-up vs. a continuos cycle back-
up. 
 
The SPS-50 consists of control box and a battery pack.  The 
SPS-50 control box senses the main power, charges the battery 
pack, converts the DC battery voltage to AC voltage (to power 
the operator) and provides control signals to activate the 
operator when the main power is interrupted.  Additionally, the 
SPS-50 control box has a set of relay outputs that are activated if 
a low battery capacity is detected.  These contact may be 
connected to an alarm system to alert the end user that battery 
maintenance is required. 
 
Gate operators are designed to start and move gates weighing as 
much as 1000 pounds or more and are capable of producing high 
levels of force.  It is important in the design of the total gate 
system that designers, installers and users be aware of the 
hazards that may be associated with the IMPROPER design, 
installation and use of vehicular gate systems and gate operators. 
 
 
As the designer and installer of the GATE SYSTEM, you must 
advise the purchaser on the proper use of the gate system.  You 
also have the primary responsibility of insuring that ALL 
possible operational hazards have been considered and 
eliminated.  YOU MUST ADVISE and WARN the purchaser 
and the ultimate user of ANY HAZARDS that you have not 
been able to eliminate. 
 
 
 
Advise the purchaser to test the operation of the SPS-50 
monthly and record the date tested on the log provided below. 
 
 
Figure 1 
PRE INSTALLATION NOTES 
NOTICE 
THE IMPORTANT SAFEGUARDS AND 
INSTRUCTIONS IN THIS MANUAL CANNOT COVER 
ALL POSSIBLE CONDITIONS AND SITUATIONS WHICH 
MAY OCCUR DURING ITS USE.  IT MUST BE 
UNDERSTOOD THAT COMMON SENSE AND CAUTION 
MUST BE EXERCISED BY THE PERSON(S) 
INSTALLING, MAINTAINING AND OPERATING THE 
EQUIPMENT DESCRIBED HEREIN.  DO NOT USED THIS 
EQUIPMENT FOR ANY OTHER THAN ITS INTENDED 
PURPOSE - PROVIDING TEMPORARY POWER TO A 
GATE OPERATOR.
 
 
W A R N I N G   H I G H   V O LTA G E
 
ONLY A QUALIFIED TECHNICIAN SHOULD SERVICE THIS GATE OPERATOR 
 
PERIODICALLY TEST SENSITIVITY OF OVERLOAD 
***  READ MANUAL  ***  
DATES 
OPERATOR  
DATE TESTED 
DATE TESTED 
DATE TESTED 
DATE TESTED 
SERVICED 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
LOG DATE BATTERY TEST  
NOTICE 
BEFORE ATTEMPTING INSTALLATION, 
 
READ THIS MANUAL CAREFULLY  SO YOU WILL BE 
THOROUGHLY FAMILIAR WITH THE FEATURES OF 
THE ALLSTAR STANDBY POWER SUPPLY AND ITS 
PROPER INSTALLATION. 
 
TO REDUCE THE RISK OF SEVERE INJURY OR 
DEATH:  READ AND FOLLOW ALL 
INSTALLATION INSTRUCTIONS AND GATE 
SYSTEM DESIGN PARAMETERS PROVIDED 
WITH THE GATE OPERATOR. 
    W A R N I N G !