Motorola Automobile Accessories F5218 User Manual

Page of 82
4
MW810 Mobile Workstation Vehicle Installation Manual
Installation
This section describes the tools and equipment, planning requirements, and product 
inspections necessary for a smooth installation of the MW810 Mobile Workstation. Proper 
planning will help to ensure that the installation is completed without difficulty and that no 
damage occurs to the units or the vehicle.
Unpacking
Unpack your shipment and check the contents to ensure that you have received all the 
specified items.
Thoroughly inspect the equipment for shipping damage as soon as possible after delivery. 
Report any damage you find to your Motorola Solutions Customer Service representative 
immediately.
Save the packing carton and anti-static plastic bags for storage and shipping. Both the 
shipping carton and the anti-static bags protect the MW810 Mobile Workstation components 
from physical and electrostatic damage.
The following optional parts can be used to mount the MW810 Mobile Workstation:
• Display mount assembly - see “12.1“ Display” on page 14 and “8.4” Display” on page 18.
• CPU Box Mounting Trunnion for the MW810 Mobile Workstation CPU - See “CPU Box 
http://www.havis.com/
Preparing to Install the MW810 Mobile Workstation Inside the Vehicle
Tools
The following tools and service aids are required for installation:
• 3/8” nut driver 
• 1/2”, 3/8” or 7/16” wrench
• No. 2 and 4 Phillips screwdriver
• Drill with 3/16” drill bit
The MW810 Mobile Workstation is a reliable product when installed 
correctly. However, performance can be seriously impaired if it is not 
installed correctly. Thoughtful planning can make the difference.
Please note that installing any part of the MW810 Mobile Workstation 
must be according to the instructions provided in this manual.
Note
!
Warning