GE DCVH480EKWW Owner's Manual

Page of 108
Installation Instructions
24
 LEVEL THE DRYER
Stand the dryer upright near the final location  
and adjust the four leveling legs at the corners  
to ensure that the dryer is level from side to side 
and front to rear.
Raise
Lower
 PLUG DRYER IN
Ensure proper 
ground exists 
before use.
1
FINAL SETUP
2
 DRYER STARTUP
Press the POWER button.
NOTE: If the dryer has been exposed to 
temperatures below freezing for an extended  
period of time, allow it to warm up before pressing 
POWER. Otherwise, the display will not come on.
The dryer is now ready for use.
SERVICING
WARNING – 
Label all wires prior  
to disconnection when servicing controls. Wiring 
errors can cause improper and dangerous 
operation after servicing/installation.
For replacement parts and other information,  
refer to the back cover for servicing phone 
numbers.
4
 GROUNDING INSTRUCTIONS
This appliance must be grounded. In the event  
of malfunction or breakdown, grounding will  
reduce the risk of electric shock by providing  
a path of least resistance for electric current.  
This appliance is equipped with a cord having an 
equipment-grounding conductor and a grounding 
plug. The plug must be plugged into an appropriate 
outlet that is properly installed and grounded in 
accordance with all local codes and ordinances.
3
NOTE: Stacking installations may require a power 
cord up to 6 feet in length.