BlueStar BSPC66240TS Owner's Manual

Page of 47
PRO LINE DUCT INFORMATION
 
MODEL 
BLOWER (cfm) 
DUCT SIZE 
TRANSITION 
BS-PL30240    BS-PLIB600  
 6” 
 
BS-PL30240    BS-PLIB1200  
10” 
 
BS-PL36240    BS-PLIB600  
 6” 
 
BS-PL36240    BS-PLIB1200  
10” 
TR6X15/10 
BS-PL42240    BS-PLIB600  
 6” 
 
BS-PL42240    BS-PLIB1200  
10” 
TR6X15/10 
BS-PL48240    BS-PLIB1200  
10” 
TR6X15/10 
BS-PL54240    BS-PLIB1200  
10” 
TR6X15/10 
BS-PL60240    BS-PLIB1200  
10” 
TR6X15/10 
BS-PL66240    BS-PLIB1200 
 
10” 
TR6X15/10 
BS-PLIB600 IS SIZED FOR A 6” DUCT.  TRC8/6 TRANSITION IS AVAILABLE TO INCREASE THE DUCT 
SIZE  TO 8” FOR OPTIMAL PERFORMANCE 
 
IMPORTANT PLANNING INFORMATION! 
PROPER INSTALLATION OF DUCTING IS EXTREMELY INPORTANT FOR OPTIMAL PERFORMANCE OF 
YOUR BLUESTAR VENTILLATION SYSTEM.   
 ALL  CFM’S ARE BASED ON TESTS AT 0.1 STATIC PRESSURE; WITHOUT STATIC PRESSURE, ALL 
CFM’S WOULD BE OVERSTATED.   
 STRAIGHT RUNS OR GRADUAL TURNS ARE BEST  
 NEVER USE FLEXIBLE DUCT WORK 
 PROPER PERFORMANCE IS DEPENDENT ON PROPER DUCT INSTALLATION, USE A QUALIFIED 
AND TRAINED INSTALLER 
 CONSULT WITH LOCAL CODES FOR MAKE UP AIR REQUIREMENTS 
 L-BRACKETS FOR THE INTERNAL BLOWER PACKAGES CAN BE MOUNTED FOR EITHER TOP OR 
REAR DISHARGE 
 BS-PLIB1200 BLOWERS REQUIRE AN ADDITIONAL PURCHASE OF A 10” TRANSITION 
P/N 750306  Page   14