Zephyr AK2100BS Owner's Manual

Page of 72
14
www.zephyronline.com
Installation – 
3-1/4”x10” rectangular ducting preparation
%\GHIDXOWWKH7\SKRRQDQG+XUULFDQHDUHSUHFRQ¿JXUHGIRUURXQGYHUWLFDOGXFWLQJ


%\GHIDXOWWKH&\FORQHLVSUHFRQ¿JXUHGIRUURXQGYHUWLFDOGXFWLQJ
1. Using a Philips-head screwdriver remove the screws and  
round vertical transition adapter from the top of the hood.
4. Replace round vertical transition adapter with 
rectangular transition adapter.  Do not secure to hood body 
yet.
 3ODFH [ UHFWDQJXODU FROODU RQ EDFN RI KRRG
and secure using the screws that previously secured the 
rectangular cover plate.
3-1/4"x10" Rectangular Horizontal Ducting 
 3ODFH [ UHFWDQJXODU FRYHU SODWH RYHU WKH
rectangular opening on top of hood from step 4.  Secure 
rectangular transition adapter and cover plate to hood body 
using the previously removed screws from step 1.
3. Typhoon ONLY. Remove the two plastic air diverter 
blocks.  The blocks are located in the hood and can be 
accessed from the top when the round transition adapter is 
removed.
2. Using a Philips-head screwdriver, remove the screws 
DQG[UHFWDQJXODUFRYHUSODWHIURPEDFNRIKRRG