Monogram ZV1050SFSS Installation Instruction

Page of 16
11
STEP 4  MOUNT TEMPLATE
• Align the template with the marks on the ceiling and
tape in place.
– Be sure the template is oriented correctly, with the
front of the hood.
• Use a plumb bob to be sure the mounting holes will
provide parallel alignment with the countertop below.
• Center punch all hole locations.
• Drill pilot holes in the 4 screw locations. Use a 5/32"
bit and drill approximately 1-1/2" deep.
• Cut the 8-1/4" duct opening and approx. 1" wire
access hole.
Installation Instructions
STEP 5  INSTALL SUPPORT FRAME
Install upper support frame
• Secure the upper support frame to the ceiling joists
and cross framing with the 4 lag screws provided. For
maximum rigidity and strength, the screws must be
driven into the center of the joists and/or cross
framing.
Check to be sure the support frame is level, vertically
and horizontally.
Install lower support frame
• Insert lower support frame (or accessory support
frame, ZX1059SFSS or ZX10510SFSS) into the upper
support frame and loosely secure with 8 screws and
washers (4 on the front and 4 on the back sides).
• Adjust the lower support frame up or down to the
desired height above the countertop. Tighten screws.
IMPORTANT: 
Again, check to be sure the support
is level in both directions. There is no way to level
the hood after the hood is secured to the frame.
30" Recommended
10"
40"
Countertop
Hood 
Mounting
Flange
Lower Support
76"
Wire Access Holes
Support 
Frame
Opening
Upper 
Support
Frame
Lower 
Support
Frame
Check Level in
Both Directions
Front
Of 
Hood