Place hooked ends of remaining direct wire cable wires  
under outer terminal block screws (hooks facing right). 
Squeeze hooked ends together and tighten screws. Finally, 
reinsert tab of terminal block cover into slot of dryer rear 
panel. Secure cover with hold-down screw. Now, go to 
“Venting Requirements”. 
5.
 
Connect remaining wires
3-wire Direct Wire Connection
 
 
Use where local codes permit connecting cabinet-ground 
conductor to neutral wire. 
B
2.
 
Remove center screw
Remove center terminal block screw (B).
Direct wire cable must have 5 ft. (1.52 m) of extra length so 
dryer may be moved if needed.
Strip 3
1
/
2
" (89 mm) of outer covering from end of cable. Strip 
insulation back 1" (25 mm). If using 3-wire cable with ground 
wire, cut bare wire even with outer covering. Shape wire ends 
into hooks. 
     1"
(25 mm)
    3½"
(89 mm)
1.
 
Prepare your 3-wire cable for  
     direct connection
Connect remaining wires
4.
Place hooked ends of remaining direct wire cable wires  
under outer terminal block screws (hooks facing right).  
Squeeze hooked ends together and tighten screws. Finally, 
reinsert tab of terminal block cover into slot of dryer rear  
panel. Secure cover with hold-down screw. Now, go to  
“Venting Requirements”.
C
B
Place hooked end of neutral wire (white 
or center) (C) of direct wire cable under 
center terminal block screw (B). Squeeze 
hooked end together. Tighten screw.
3.
 
Connect neutral wire
1.
 
Prepare to connect neutral 
     ground wire and neutral wire
B
E
A
Remove center terminal block screw (B). Remove neutral ground 
wire (E) from external ground conductor screw (A).
Optional 3-wire Connection
You must verify with a qualified  electrician that this grounding 
method is acceptable before connecting.