Bosch d9412gv3 User Manual

Page of 154
D9412GV3/D7412GV3 | Program Entry Guide | 4.0  Schedules (Skeds) 
EN | 117 
 
 
Bosch Security Systems, Inc. | 10/11 | F01U170807-02 
 
Default: 
Selection: 
0 to 24, 28, 29 
 
 
 
  S## Defer Test 
 
 
 
 
Yes 
Defer the Test 
Report. 
Default: No 
Selection: Yes or No 
Enable sked to defer the Test 
Report 
No 
Send the Test 
Report on 
schedule. 
 
 
 
  S## Hourly Report 
 
 
 
 
Yes 
Send the Test 
Report every hour. 
Test Report: This function emulates 
the Test Report? sub-function of the 
Send Report? keypad function 
([COMMAND][4][1]). This function 
generates a Test Report only from 
Area 1 but contains panel-wide status 
information. The report is sent to the 
phone(s) programmed for Test and 
Status Reports in Section 2.3.8 
Communication Attempts 
on page 18. 
If Expand Test Report in Phone 
parameters is programmed as Yes
the Test Report also includes all off-
normal states for events listed in Test 
Reports
 (refer to Table 12 on page 
23) and some events listed in 
Diagnostic Reports (refer to the 
footnotes with Table 13 on page 24)  
The Test Report can be deferred if 
any other report was sent since the 
last Test Report. To defer the Test 
Report, program S## Defer Test
The Test Report can be sent every 
hour beginning at the time scheduled 
in S## Time. To send a Test Report 
every hour, program S## Hourly 
Report
 
 
To meet UL 864 
requirements, use the 
Sked function to meet the 
daily Test Report 
requirement. 
 
 
Default: No 
Selection: Yes or No
  
Select Yes to send the Test 
Report every hour. 
 
No 
Send the Test 
Report only as 
scheduled. 
 
 
 
  S## Defer Status 
 
 
 
 
Yes 
Defer the Status 
Report. 
10  Status Report: This function 
generates a Status Report for each 
area that is enabled. The report is 
sent to the phone(s) programmed for 
Test and Status Reports in Routing. 
The Status Report can be deferred if 
any other report was sent since the 
last Status Report. To defer the 
Status Report, program S## Defer 
Status
Default: No 
Selection: Yes or No
 
Enable sked to defer the 
Status Report. 
 
No 
Send the Status 
Report on 
schedule. 
(Continued on next page.)