Sterling 882.00379.00 User Manual

Page of 138
Conveying System Mechanical Components    Chapter 3: Installation 
68 of 138 
Figure 33:  Volume-Fill, Time-Fill, Vacuum Receiver Wiring Connections 
115 VAC Control Circuit 
 
To controller input for
Hopper-Full/Bin-Full switches
Hopper-Full
switch (PRS)
Vacuum Receiver - Volume fill 
Bin-Full
switch
(LS)
Blue
Brown
115 VAC
From controller output for
vacuum sequence valve solenoid
Vacuum
Seq. valve
(SOL)
Neutral
switch
Bin-Full
Vacuum Receiver - Time Fill 
(LS)
Bin-Full switch
To controller input for
115 VAC
vacuum sequence valve solenoid
From controller output for
seq. valve
Vacuum
(SOL)
Neutral
 
(when using a proximity switch as a Bin-Full (Demand) switch)
Vacuum Receiver - Time Fill
switch
(LS)
Bin-Full
To controller input for
Bin-Full switch
115 VAC
Blue
Brown
vacuum sequence valve solenoid
seq. valve
Vacuum
(SOL)
From controller output for
Neutral