Southbend SB1059F User Manual

Page of 140
MAINTENANCE
-66-
For Machines Mfg. Since 3/11
EVS Toolroom Lathe w/DRO
M A I N T E N A N C E
Always disconnect power 
to the machine before 
performing maintenance. 
Failure to do this may 
result in electrocution or 
accidental startup injury.
!
Maintenance Schedule
Cleaning & Protecting
Regular cleaning is one of the most important 
steps in taking care of this lathe. We recommend 
that the cleaning routine be planned into the 
workflow schedule, so that adequate time is set 
aside to do the job right.
Typically, the easiest way to clean swarf from 
the bed ways and chip drawer is to use a wet/dry 
shop vacuum that is dedicated for this purpose. 
The small chips left over after vacuuming can be 
wiped up with a slightly oiled rag. Avoid using 
compressed air to blow off chips, as it may drive 
them deeper into moving surfaces and could 
cause sharp chips to fly into your face or hands.
Besides the ways, all other unpainted and 
machined surfaces should be wiped down daily 
to keep them rust-free and in top condition. This 
includes any surface that is vulnerable to rust 
if left unprotected (especially any parts that are 
exposed to water-soluble coolant). Typically, 
a thin film of oil is all that is necessary for 
protection.
For optimum performance from this machine, 
this maintenance schedule must be strictly 
followed. We strongly recommend all operators 
make a habit of following the daily maintenance 
procedures. Use the chart provided on Page 67 
to ensure this is done.
Ongoing
The condition of machine components should be 
carefully observed at all times to minimize the 
risk of injury or machine damage. If any of the 
conditions below are observed, stop the lathe 
immediately, disconnect power, and correct the 
condition before resuming operations:
s
,OOSE
s
7ORN
s
'UARDS
s
34/0
s
!
s
/IL
s
#OOLANT
s
Damaged or malfunctioning components.
Daily, Before Operations
s
#HECKADD
s
#HECKADD
s
#HECKADD
s
#HECKADD
s
,UBRICATE
s
!DD
s
#LEANLUBRICATE
s
$ISENGAGE
s
%NSURE
Daily, After Operations
s
$EPRESS
s
6ACUUMCLEAN
s
7IPE
Monthly
s
$RAIN
Annually
s
#HANGE
s
#HANGE
s
#HANGE
s
,UBRICATE
s
#HECKLEVEL