ACR Electronics 3940.1 User Manual

Page of 11
Y1-03-0165 Rev. D 
FOREWORD 
 
We  design,  manufacture  and  distribute  quality  products  knowing  they  are  used  to  save  lives.  Many  of  our  products  are 
required to be tested  and  approved by regulatory  bodies  worldwide. We believe in going  beyond those specifications to 
insure our products work when needed in real world conditions. With proper care and maintenance your ACR product will 
last for years. It is important that you thoroughly read this product support manual to understand the proper care and use 
of your ACR product. 
 
ACR is proud to be certified to ISO 9001: 2000, the International Standard for Quality. 
 
Test light buoyancy in shallow water prior to placing in service. 
 
The following battery types are suggested for use in ACR Marker lights: 
 
Suggested Screw Terminal batteries: 
 
BRAND 
MODEL NUMBER 
ANSI/NEDA: 
915, 915C, 915D, 915AC 
Duracell:  
M915, PC915 
Rayovac: 
942, 945 
Eveready: 
510S 
 
Suggested spring terminal batteries (for use with optional battery adapter 9434): 
 
BRAND 
MODEL NUMBER 
ANSI/NEDA: 
908, 908C, 908D, 908AC 
Duracell: 
M908, PC908 
Eveready: 
509, 1209 
Energizer: 
EN529, (not 529
Rayovac: 
941, 944 
Panasonic: 
W-4FD 
 
NOTE: Check adapter to ensure that screws are tight during regular maintenance. 
 
SECTION 1 - INSTALLATION 
 
1.1 
Installation Procedure 
The installation procedure requires that the mounting bracket be securely fastened in any convenient location  that would 
provide immediate access in the event of an emergency. 
 
Suitable length ¼ - 20 stainless screws should be used for mounting the bracket. Screw heads should not protrude inside 
the bracket surface. 
 
1.2 
Battery Installation 
The  SM-2  is  normally  shipped  from  the  factory  without  a  battery.  Follow  disassembly  instructions  in  Section  2  of  this 
manual  for  battery  installation.  The  SM-2  uses  a  standard  6  volt  lantern  type  battery  with  screw  terminals.  A  list  of 
recommended batteries can be found above. Note maximum allowable battery weight listed in Section 3.12. 
 
SECTION 2 - MAINTENANCE 
 
2.1 
Operation 
The unit should be tested  monthly. Remove  the  SM-2 from its bracket and  invert it. The unit should begin flashing, at a 
rate of about one flash per second. Re-invert the unit after confirming correct operation. 
 
2.2 
Inspection 
Check  the  exterior  of  the  unit  for  damage  which  might  affect  proper  operation  (damage  to  globe,  cracks  in  case,  etc.). 
Check bracket security.