Chamberlain LA412 User Manual

Page of 48
6
JUNCTION BOX
The following items are required to complete the junction box installation:
• 4 x 4 Junction Box with 3/4" NPT threaded port holes
• Screws
• PVC Conduit
Open the junction box by removing screws (4) and set aside.
Mount the junction box within 5' of second operator.
Junction Box 
Cover
Junction Box
Mov
ing 
Gate Can 
Ca
use
 
Inju
ry o
r Death
 
KEE
P CL
EAR!
 Gate 
may
 mo
ve a
t any 
tim
e wit
hout
 pri
or w
arn
ing.
 
 
Do 
not 
let c
hild
ren 
ope
rate 
the 
gat
e o
play 
in the
 gat
e ar
ea. 
 This 
entr
ance 
is f
or vehic
les o
nly
 
Pedest
rians
 mu
st use
 sepa
rate
 ent
ran
ce 
Control Box
Gate Operator (Gate 1)
Gate Operator (Gate 2)
Extension Cable
Within 5’
Within 5' PVC conduit 
(not provided) to protect 
the power cable for solar 
panel and low voltage 
wire from lawn mowers 
and string trimmers.
 25 
Wiring
Junction Box
Solar Panel 
(facing South)
Screws (4)