EMC 300-000-978 REV A03 User Manual

Page of 114
1
1-2
Installing PowerPath
Before You Install
The sequence in which you configure the storage and install 
PowerPath® depends on the storage system you use:
Symmetrix
®
 storage systems. 
Install PowerPath after you set up the 
Symmetrix system. Verify that the Symmetrix system is working 
properly, then install PowerPath using the instructions in this guide.
CLARiiON
®
 storage systems. 
PowerPath installation is an integral 
part of a CLARiiON setup and configuration procedure. To properly 
install PowerPath on a host with a CLARiiON array, refer to the EMC 
Installation Roadmap for CX-Series and FC-Series Storage Systems. 
There 
you will find step-by-step instructions for installing PowerPath and 
other CLARiiON software.
The rest of this section describes what to do before you install 
PowerPath on the host.
Obtain Up-To-Date Information
Check the Powerlink website (
) for the 
most current information:
❑ Release notes — We update the PowerPath release notes 
periodically and post them on the Web.
❑ Patches and notices — Review the patch ReadMe files to 
determine which patches (if any) you want to install after 
PowerPath, and whether those patches have any added 
prerequisites that must be met before you install PowerPath.
Choose a Convenient Time
Installing PowerPath requires you to reboot the host. Plan to install or 
upgrade PowerPath when a reboot will cause minimal disruption to 
your site.