Bosch GWH 425 PN User Manual

Page of 16
13
AQ4 Manual
NOTE: HARDWARE SHOWN INCLUDED
             WITH VENT HOOD
BUILDING 
EXTERIOR
WASHER (4)
SHEET METAL SCREW (4)
PILOT 
HOLE
PILOT 
HOLE
CUT HOLE THROUGH WALL
TEMPLATE
WHEN INSTALLING THE VENT HOOD FOLLOW THE BACK DRAFT FLAPPER 
INSTRUCTION SHEET IF OUTDOOR TEMPERATURES MAY DROP BELOW FREEZING
Fig. 14 Vent hood mounting template
Vent hood template
8 Vent hood mounting template
1. Use scis sors to detach template.  Verify external vent hood installation clearances on page 5 (Fig. 1) are adhered to.  Attach
the vent hood mounting template to the interior of the wall the vent hood will be penetrating.
2. Verify that wall penetration will not come in contact with concealed wiring or plumbing. Using a 1/2” drill bit, drill two pilot
holes where noted on the template.  The drill bit must be long enough to pene trate to the building exterior.
3. Attach the template to the building exterior aligning the pilot holes on t he template with the pilot holes drilled in step 2.
4. Using a reciprocating saw, cut an opening through the building siding, wall board, etc., following the lines of the template.
5. Slide the vent hood through the opening and fasten to exterior wall using provided screws.
6. Once power venter is completely installed and secured, apply a bead of exterior rated caulk between vent hood flange and
exterior of building.