GE Monogram ZXR758 User Manual
Installation Instructions
6
1 DETERMINE INSTALLATION
LOCATION
To determine the exact location of the vent hood.
• Locate the template packed with the literature.
– Measure 36" from the floor to the top of the
cooking surface. Add 25-1/2" recommended
space from the cooking surface to the bottom
of hood. Mark that location.
space from the cooking surface to the bottom
of hood. Mark that location.
– Use a level to draw a straight pencil line on the
wall.
– Tape the template in position along the penciled
line. CHECK TO BE SURE THE TEMPLATE IS
LEVEL.
LEVEL.
– Measure from the peak of the hood to the ceiling
as indicated.
2 INSTALL MOUNTING BRACKETS
Whenever possible, the vent hood should be secured to wall
studs.
studs.
• With the template taped in place, use a punch to
mark all mounting screw locations.
• Drill 1/8" pilot holes at the 6 punched locations.
• Remove the template.
• Enlarge holes that did not enter studs to 3/8" and
• Remove the template.
• Enlarge holes that did not enter studs to 3/8" and
tap anchors for metal wall fasteners into the holes.
– Drive screws into the fasteners to allow anchors to
– Drive screws into the fasteners to allow anchors to
expand against the wall material. Remove the
screws for final installation.
screws for final installation.
• Secure the mounting brackets to the wall studs with
wood screws provided.
– For hollow walls, secure the mounting brackets
– For hollow walls, secure the mounting brackets
through the anchors.
For ZXR758 –
26-1/4" to 38-1/2" for 8 ft. to 9 ft. ceilings.
For ZXR7510
26-1/4" to 38-1/2" for 8 ft. to 9 ft. ceilings.
For ZXR7510
–
38-1/4" to 50-1/4" for 9 ft. to 10 ft. ceilings.
• Use a level to draw a line straight up, from the
• Use a level to draw a line straight up, from the
centerline on the template to the ceiling.
House Wiring Locations
• The junction box is located on the top of the
hood, at the front right side.
• Route house wiring as close to the installation
location as possible; through the ceiling, soffit or
back wall. Wiring should enter at least 4" above
the bracket on the right side.
back wall. Wiring should enter at least 4" above
the bracket on the right side.
Note: Screws “A” and
“B” are pre-assembled
onto the brackets. Do
not remove these
screws.
“B” are pre-assembled
onto the brackets. Do
not remove these
screws.
Screws
“B”
Screws
“A”
• Drill 1/8" Pilot Holes For Mounting Brackets.
Ceiling
Align edge 25-1/2" above Cooking Surface.
17-5/16"
3-15/16"
13-9/16"
2-5/32"
C
L
• Drill 1/8" Pilot Holes.
• Drill 1/8" Pilot Holes.
26-14" to 8 ft. Ceiling
38-1/4" to 9 ft. Ceiling
38-1/4" to 50-1/4" For
9ft. to 10 ft. Ceiling
Using Optional Accessory
ZX10SY Duct Cover
5-7/8"