Cornelius UF-1 User Manual
UF-1 and UFB-1 Valves Training Manual
© 1999-2005, IMI Cornelius, Inc.
- 17 -
3. Detach current valves:
– Remove front cover by lifting.
– Remove valve cover.
– Unplug wiring harness.
– Remove valve.
3. INSTALLATION CHECKLIST
1. Voltage and proper grounding.
2. Valve properly secured (latched) to block.
3. CO
2
pressure to carbonator.
4. Water flow rate.
5. Syrup delivery pressure.
6. Finished product temperature less than 40°F.
7. Water to syrup ratio.
8. Portion size / top-off.
9. Water, syrup, CO
2
leaks.
10. Cover secured to valve.
11. Valves flavor correctly marked.
4. R
ETROFITTING
UF-1 and UFB-1 valves will retrofit any valve with an identical mounting block screw pattern.
Note: Replacement of mounting block inlet fitting O-rings (part # 4073) is required when retrofit-
ting valves.
4.1 Mounting Block Removal
To remove valve mounting block from the front panel, take out and save 4 screws.
IMPORTANT: Before installing block replace O-rings on each outlet fitting. Lubricate
with Dow 111 or equivalent silicone lubricant. Do not use petroleum jelly.
with Dow 111 or equivalent silicone lubricant. Do not use petroleum jelly.
INS
T
T
ALLATION