Sun Microsystems FC-100 User Manual

Page of 38
Chapter 2
Installation
2-7
1. Connect the female end of the power cord to the power receptacle at the rear of
the hub (
2. Route the power cord down the right side and along the bottom of the cabinet.
3. Route the power cord up through the cutout to the power distribution unit at the
left side of the cabinet.
Caution –
The power distribution unit serves as the primary disconnect device for
the hub. Do not connect the hub into a power source other than the power
distribution unit. Personal injury can result if you work on a hub that is connected
into another power source, since that power source may still be active when you
work on the hub.
4. Connect the power cord for the tray to the power distribution unit.
If your power distribution unit has a sequencer, connect the first hub to one of the
four lower outlets. Connect the second hub to one of the four upper outlets.
5. Tuck the extra length of the power cord down into the pocket beneath the power
distribution unit.
2.3.7
Verifying the Configuration
1. Power on all nodes and then the hub.
Note –
Refer to the handbook that came with your peripheral and your system
installation manual for instructions on safely powering on the cabinet.
2. Make sure that the Device Active LEDs are lit for active hub ports.
The Bypass LEDs for active ports should be off.
The Device Active LED for an active port is flashing
The Bypass LED for an active port is on
The Device Active LED for an active port is off
The FC-AL should now be operational.