DELL N3000 User Manual

Page of 1460
Managing a Switch Stack
199
NSF in the Data Center
Figure 9-12 illustrates a data center scenario, where the stack of two Dell 
Networking switches acts as an access switch. The access switch is connected 
to two aggregation switches, AS1 and AS2. The stack has a link from two 
different units to each aggregation switch, with each pair of links grouped 
together in a LAG. The two LAGs and link between AS1 and AS2 are 
members of the same VLAN. Spanning tree is enabled on the VLAN. Assume 
spanning tree selects AS1 as the root bridge. Assume the LAG to AS1 is the 
root port on the stack and the LAG to AS2 is discarding. Unit 1 is the stack 
master. If unit 1 fails, the stack removes the Unit 1 link to AS1 from its LAG. 
The stack forwards outgoing packets through the Unit 2 link to AS1 during 
the failover. During the failover, the stack continues to send BPDUs and LAG 
PDUs on its links on Unit 2. The LAGs stay up (with one remaining link in 
each), and spanning tree on the aggregation switches does not see a topology 
change. 
Figure 9-12. Data Center Stack Topology