Connecting the AC Line Voltage (Main Voltage) 
The SPS-50 is designed to provide back-up power to the gate 
operator ONLY.  Auxiliary devices such as loop detectors, card 
readers, phone entry systems, etc., must NOT be connected to 
the output of the SPS-50.  These devices may overload the 
capacity of the SPS-50 and prevent proper gate operation. 
 
Electrically, the SPS-50 is wired in series with the incoming AC 
supply from the breaker box to the operator.  The connector 
labeled AC IN is connected to the main AC supply.  The AC 
OUT is connected to the operator. 
 
Refer to the diagram on page 7 for the following: 
 
Connect the incoming AC line to the AC IN as follows: 
 L - AC Line In (live):  Black 
 N - AC neutral (common):  White 
 G- AC Ground (earth):  Green 
 
Connect the outgoing AC line to the AC OUT as follows: 
 L - AC Line out:  Black 
 N - AC neutral:  White 
 G- AC Ground:  Green 
Refer to the instructions provided with the operator for the 
proper connections to the operators. 
 
Connecting the Relay Outputs 
Two sets of relay outputs are available on the SPS-50.  The set 
marked  LO BAT  are intended to be alarm contacts to alert of 
low battery capacity.  These must be connect to a suitable alarm 
system (not provided). 
 
The set marked RELAY are connected to the operator as 
follows: 
 CM - Common, connected to the control input common terminal 
of the operator 
 NO - Normally open, connected to the hold open terminal of the 
operator 
 
If the operator uses a normally closed control circuit, the NC 
contact may be used.  Refer to the instructions provided with the 
operator for the proper connections to the operator control panel. 
 
 
Applying Power and Connecting the Battery Pack 
 
Follow the steps below when connecting the battery pack to the 
SPS-50: 
 
1.   Turn the main power on.  The AC LED on the SPS-50 
should be on. 
2.   Test the operator for several open / close cycles 
3.   Connect the battery pack to the SPS-50.  Connect the red 
wire to the red terminal on the batter pack and the black 
wire to the black terminal on the battery pack 
 
WARNING!:  Do not reverse the connections to the battery 
pack.  Reversing the leads will permanently damage the SPS-50. 
 
Typically, the batteries will require 24 hours of charging time 
after installation. 
 
 
Testing the SPS-50 
After the batteries are charged, the SPS-50 may be tested.  To 
test, turn the main power off and allow the SPS-50 to cycle the 
operator.  There will be approximately a ten second delay 
between the loss of AC power and when the operator starts to 
open.  After approximately 30 seconds, the SPS-50 will shut 
down the power to the operator. 
 
After the completion of the test, turn the main AC power back 
on.  After approximately ten seconds a reset pulse will be sent to 
the operator.  If the operator is wired for auto timer to close, it 
should close at the end of the time delay period. 
 
The SPS-50 will only provide back-up power for 2-5 cycles 
(depending on battery charge, temperature and gate size and 
weight).  If the battery charge is too low, the SPS-50 will not be 
able to develop sufficient voltage to power the gate operator and 
the batteries must recharge before additional testing. 
 
A monthly test should be made to ensure proper operation of the 
system. 
 
 
 INSTALLING THE SPS-50 
RISK OF ELECTROCUTION.  DO NOT BEGIN 
THE ELECTRICAL CONNECTION 
PROCEDURES UNTIL THE POWER IS TURNED 
OFF AT THE CIRCUIT BREAKER. 
    W A R N I N G !  
DO NOT CONNECT THE BATTERY PACK UNTIL 
AC POWER IS TURNED ON.  ARCING WILL 
OCCUR AND THE SPS-50 WILL ACTIVATE THE 
GATE OPERATOR. 
  CAUTION !