B&K 1786B User Manual

Page of 38
 
33 
 
 
 
 
 
3. Program setting 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
6.3.4. GO/NG Test Function 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Program: Right-click on the Program area, the program 
tools (Append a line, Insert a line, Delete a line, Delete 
Select etc.) will appear on the window. Click the tools to 
program the steps.   
 
Double-click on each value to change them from key board 
as you desired. Also you can change the time unit 
(hour/minute/second) by clicking on “Sec”.   
 
After programming, you can select a run mode for your 
program. (Run mode includes Once, Repeat and Custom).   
       
 
Click “Run” button to send the program settings to the power 
supply. The power supply’s output will respond to the 
program. 
 
 
Click “Stop” button to stop sending the program settings to 
the power supply. The power supply state will return to the 
state before the program running.   
 
Click “Chart” to show the voltage and current chart of the 
program.   
You can do some analysis on the chart or print the chart. 
The chart is as follows:   
 
GO/NG is an auto test function, to test if the EUT 
(equipment under test) can meet the specification. To use 
this function, follow up the steps below: 
1. Right-click on the window, the edit tools (Append a line, 
Insert a line, Delete a line, Delete Select etc.) will 
appear on the window. Use the edit tools to edit the test 
steps.   
 
2. To set the Voltage, Max Amps, Min Amps and Delay 
time according to the specifications of the EUT. 
 
3.
 
Click the Run button to start the test. If the Real Amps of 
all steps are in the range of Min Amps to Max Amps, 
then the EUT will pass the test, the Pass window will 
appear. 
 
4. If there is a Real Amps beyond the range in any step, 
the EUT will not pass the test.