Netgear RN10223D-100NAS User Manual

Page of 120
NETGEAR ReadyNAS User Guide
1-48
Configuring Your ReadyNAS
v1.0, October 2007
Viewing the Backup Schedule
After saving the backup job, a new job appears in the Backup Schedule section of the Backup Jobs 
screen.
A summary of the backup jobs that have been scheduled are shown; jobs are numbered beginning 
at 001. 
To manage your backup jobs:
1. Click the Job number icon to modify the selected backup job.
2. Enable or disable job scheduling by selecting/clearing the Enable check box. Disabling the 
job does not delete the job, but removes it from the automatic scheduling queue. 
3. Click Delete to permanently remove the job.
4. Click Go to manually start the backup job. The status changes when the backup starts, when 
an error is encountered, or when the job has finished.
5. Select the View Log link to check a detailed status of the backup.
6. click Clear Logs to refresh and clear the current log detail.
Figure 1-50