D9412GV3/D7412GV3 | Operation and Installation Guide | 4.0 
Installation 
 
Bosch Security Systems, Inc. | 10/10 | F01U143070-03 
17
 
4.6 
Completing the Installation 
If not already complete, make the earth ground 
connection to Terminal 10 and lock the reset pin in 
the closed position. 
4.6.1  Charging the Battery 
Connect the battery, then the transformer to allow the 
control panel to charge the battery while you complete 
the installation. Refer to Section 5.0 Power Supply on 
page 22 for instructions. 
On-board Buzzer Sounds at Power Up and Reset: 
The system performs a series of self-diagnostic tests 
of hardware, software, and programming at power up 
and at reset. The buzzer on the control panel sounds 
during the tests. The self-diagnostics tests complete 
in approximately 1 to 3 sec. 
If the control panel fails any test, the buzzer continues 
sounding and a System Trouble message appears at 
the keypads.  
Touch Terminal 10 First: If the on-board buzzer 
sounds briefly when the control panel is touched, any 
static charge you carry discharges to the control 
panel.  
 
Avoid electrostatic discharge. Always 
touch Terminal 10, the earth ground 
connection, before beginning work on the 
control panel. 
If the control panel receives an electrostatic 
discharge, it might generate Watchdog Reset and 
Param Fail events.  
4.6.2  Installing and Wiring Detection Devices 
Install and wire detection devices and keypads at their 
locations throughout the premises. Do not connect 
the control panel yet.  
Section 8.0 On-Board Points on page 31 contains 
instructions for wiring the on-board points to detection 
devices. Section 11.0 Arming Devices on page 55 
contains instructions for wiring the keypads. 
Instructions for wiring the off-board point POPIT 
sensor loops are found in the instructions packaged 
with the POPIT modules. 
4.6.3  Installing Modules and Relays 
1.  Power down the unit by unplugging the 
transformer and disconnecting the battery. 
 
Always power down the unit when 
installing modules or relays, or when 
making wiring connections to the control 
panel. 
2.  Install and wire any modules required for the 
installation as described in the module’s 
installation instructions.  
Instructions for the D8125 POPEX Module, 
D8128D OctoPOPIT Module, D8129 OctoRelay 
Module, D811 Arm Status Relay Module, and 
D928 Dual Phone Line Switcher appear in this 
guide. 
Refer to Section 9.0 Off-Board Points on page 
36 for D8125 and D8128D instructions. Refer to 
Section 10.0 Off-Board Relays on page 50 for 
D8129 and D811 instructions. Refer to Section 
7.11 D928 Dual Phone Line Switcher
 on page 30 
for D928 instructions. 
3.  If using the power outputs at Terminals 7 or 8, 
refer to Section 6.4 Programmable Power Output 
Terminals 6, 7, and 8 
on page 27 for 
instructions. 
4.6.4  Connecting the On-board Points and 
Keypads 
4.  Connect the on-board points and keypad wiring to 
the system. Refer to Section 8.0 On-Board Points 
on page 31 and Section 11.0 Arming Devices on 
page 55 for instructions. 
4.6.5 Powering 
Up 
Reconnect the battery, then plug in the transformer. 
The buzzer sounds for two sec when the control panel 
is powered up. Leave the reset pin in the locked 
position.  
Yellow Charging Status LED Remains Lit: If the 
yellow charging status LED remains lit after five 
minutes of powering up the control panel, either the 
battery is deeply discharged or too many powered 
devices were connected to the control panel. 
Combined continuous current draw for Terminals 3, 8, 
24, and 32, and the accessory connector cannot 
exceed 1.4 A. Refer to Section 6.0 Power Outputs on 
page 26 for help. 
4.7 Programming 
the Control Panel 
If the control panel is not already programmed, review 
the D9412GV3/D7412GV3 Program Entry Guide  
(P/N: F01U170807). Ensure that all accessory 
modules for desired features are available for 
installation. 
Use RPS to load a custom program into the control 
panel as needed.