AMX CB-TP10 Leaflet

Page of 2
Installation Guide
CB-TP10
 
Rough-In Box for 10" Wall/Flush Mount Touch Panels
Overview
The CB-TP10 Rough-In Box is an optional accessory for 10” Modero® Wall/Flush 
Mount Touch Panels. The Rough-In Box allows the panel to be mounted directly to the 
studs/pre-wall and includes a wall box and mounting screws. 
Wall Mount panels (NXDs) are contained within a metallic outer housing (back box). 
This back box is not removed when installing the NXD into a Rough-In Box. The back 
box is only removed to gain access for the replacement of the Compact Flash 
component or upgrade to the VESA housing.
Specifications 
WARNING: INSTALLER, LEAVE A GAP BETWEEN THE STUD AND ROUGH-IN 
BOX TO ACCOMMODATE THE DRYWALL/SHEETROCK. 
This gap allows the installation of the drywall/sheetrock after the CB-TP10 has been 
mounted onto the beams. The rough-in box installation must be done prior to any wall 
installation.
Note: The most important thing to remember when mounting this rough-in box is that 
the mounting tabs must be mounted flush against the outside of the sheetrock. 
It is recommended that you cut out the surface slightly smaller than what is outlined in 
the installation drawings so that you can make any necessary cutout adjustments.
The wiring knockouts on the left side will be used for the NXD-CV10 Wall Mount panel 
connectors, so always secure the rough-in box to the stud using the Stud Mounting 
Holes on the right side of the box.
Pre-Wall Installation of the CP-TP10 Rough-In Box
Refer to the SP225802 diagram for detailed installation dimensions (see 
reverse).
Cutting out the surface slightly smaller than what is outlined in the installation 
drawings, in order to make any necessary cutout adjustments, is highly 
recommended.
The wiring knockouts on the left side will be used for the NXD-CV10 Wall Mount 
panel connectors, so always secure the rough-in box to the stud using the Stud 
Mounting Holes on the right side of the box.
1.
Rest the right Stud Mounting tabs onto the stud (keeping the knockouts on the 
left). Be sure to leave enough of a gap between the stud and NXD Mounting tabs 
to accommodate the installation of the drywall or sheetrock after the rough-in 
box has been mounted. Ultimately, the Mounting Tabs should lie flush against 
the outside of the sheetrock.
2.
Fasten the CB-TP10 rough-in box to the stud through the holes on the right Stud 
Mounting tabs (FIG. 1), using either nails or screws.     
3.
Remove the wiring knockouts from the left side of the CB-TP10 to accommodate 
the cables being threaded through to the NXD touch panel.
Note: Remember that when mounting this rough-in box, the NXD mounting tabs must 
lie flush against the outside of the sheetrock.
4.
Thread the incoming power, RJ-45 audio/video, Ethernet, and USB wiring 
through the knockouts (use of the left wiring knockouts are recommended with 
this installation). Leave enough slack in the wiring to accommodate any re-
positioning of the panel.
5.
Install the drywall/sheetrock before inserting the main NXD unit into the 
CB-TP10.
CB-TP10 (FG036-10) Specifications
Dimensions (HWD) • 7 3/8" x 10 3/8" x 3 3/8" 
• 18.7 cm x 26.4 cm x 8.6 cm
Included 
Accessories
• 4 Phillips pan-head (#4-40 x 0.375 Black) screws (80-0115)
• 4 Phillips pan-head (#4-40 x 0.625 Black) screws (80-0118)
Certifications
• cTUVus Listed
FIG. 1  
CB-TP10 - Drywall Installation
Rough-In Box
Drywall
See reverse for 
detailed dimensions
Do Not Use these 
tabs to mount 
the Rough-In Box
Front surface of 
mounting tabs should 
be flush with outside 
face of drywall
Stud
Recommended Cutout for
CB-TP10 Rough-In Box