Sterling SSV-052R User Manual

Page of 37
XSV-05, XSV-05/R, & XSV-05/2R Single Conveying Units - Venturi Style 
35 of 36 
 6-3 
Quick Start Guide –XSV Venturi Loader 
Unpack all parts.  Check for the following: 
•  Conveying hopper with level sensor 
•  Control and maintenance unit 
• Venturi 
assembly 
•  Vinyl flexible hose 
•  Compressed air hose 
• Operating 
instructions 
•  Mount the conveying hopper using the flange provided on its base. 
•  Mount the control module at a location that is readily accessible.  Make sure 
that the compressed air hose and level sensor cable are long enough to 
reach the control module. 
•  Connect the compressed air supply from the control module to the fitting 
located on the material pick up wand.   
•  Connect shop compressed air to the regulator on the control module.  
Compressed air connection must be 70-90 psi (5-6 bar). 
•  Plus the control module into the main power socket.  Make sure that the 
correct voltage is being used. 
•  Adjust the level sensor to sense the material that is being conveyed into the 
conveying hopper. 
•  Maintain the unit as stated in Chapter 5 of this manual.