Avaya 03-300686 User Manual

Page of 156
152 Installing and Connecting the MDF and Telephones
 
Index
installing between cabinet and MDF
 .  .  .  .  .  .  .  
outputs for control carrier
 .  .  .  .  .  .  .  .  .  .  .  .  
cables, installing between auxiliary cabinet and MDF
.  
cabling
installing trunk cables
.  .  .  .  .  .  .  .  .  .  .  .  .  .  
labels
  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  
provisioning plan
 .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  
cabling layout
 .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  
calling queue
  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .
carbon block protectors
off-premises connections
 .  .  .  .  .  .  .  .  .  .  .  .  
checking
circuit pack configuration
  .  .  .  .  .  .  .  .  .  .  .  .
system status
.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .
circuit packs
configuration, testing
 .  .  .  .  .  .  .  .  .  .  .  .  .  .
DS1 converter LEDs
  .  .  .  .  .  .  .  .  .  .  .  .  .  .
duplication interface LEDs
.  .  .  .  .  .  .  .  .  .  .  .
LEDs
  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .
C-LAN connection, testing
 .  .  .  .  .  .  .  .  .  .  .  .  .
closets
site locations
 .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  
CO trunk wiring
  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  
collocated DS1 tie trunks, wiring
  .  .  .  .  .  .  .  .  .  .  
concentrator cables, connecting trunk pairs
 .  .  .  .  .  
connect
1151B1 and 1151B2 power supply
.  .  .  .  .  .  .  .
adjunct power
  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  
external alarm indicators
  .  .  .  .  .  .  .  .  .  .  .  .  
connecting
1152A1 power distribution unit
.  .  .  .  .  .  .  .  .  .
C360 switch
  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .
connecting control carrier outputs cable
 .  .  .  .  .  .  .  
connection diagrams, station cables
.  .  .  .  .  .  .  .  .  
console
attendant, testing
.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .
selector, testing
.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .
control carrier cable labels
 .  .  .  .  .  .  .  .  .  .  .  .  .  
control carrier outputs cable
  .  .  .  .  .  .  .  .  .  .  .
coupled bonding conductor wires, installing
 .  .  .  .  .  
critical reliability
testing systems
.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .
cross-connect fields, MDF
  .  .  .  .  .  .  .  .  .  .  .  .  .  
D
data link protector, installing
  .  .  .  .  .  .  .  .  .  .  .  .  
DC power
 .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  
DID trunk wiring
 .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  
digital line circuit protectors
.  .  .  .  .  .  .  .  .  .  .  .  .  
digital tie trunk wiring
.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  
direct department calling
testing queue warning indicator
  .  .  .  .  .  .  .  .  .
downloading this book and updates from the Web
 .  .  
DS1 converter
circuit pack LEDs
 .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  
DS1 tie trunks, wiring
.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 
dual wiring of 2-wire and 4-wire endpoints
 .  .  .  .  .  . 
E
emergency transfer panel, installing
 .  .  .  .  .  .  .  .  . 
emergency transfer telephones
 .  .  .  .  .  .  .  . 
emergency transfer units
 .  .  .  .  .  .  .  .  .  .  .  .  .  . 
emergency transfer, testing
 .  .  .  .  .  .  .  .  .  .  .  .  
equipment room
cable routing
  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 
cabling labels
 .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 
station circuit distribution from
  .  .  .  .  .  .  .  .  .  . 
expanded power distribution unit
  .  .  .  .  .  .  .  .  .  .
expansion interface circuit packs, testing
.  .  .  .  .  .  
expansion interface exchange, testing
 .  .  .  .  .  .  .  
expansion links, service state
 .  .  .  .  .  .  .  .  .  .  .  
external alarm indicators, connecting
  .  .  .  .  .  .  .  . 
external alarm wiring
 .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 
external ringing
installing
  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  
testing
  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  
F
floor plans
 .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 
G
G650 Media Gateway
110A-type terminal blocks
 .  .  .  .  .  .  .  .  .  .  .  . 
cross connecting to MDF
.  .  .  .  .  .  .  .  .  .  .  .  . 
H
hardware
MDF
 .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 
hard-wire bridging
  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 
I
I/O cables
 .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 
information outlets, wiring design
  .  .  .  .  .  .  .  .  .  . 
installing
26B1 Selector Console
  .  .  .  .  .  .  .  .  .  .  .  .  . 
4C3S-75 enhanced protector
.  .  .  .  .  .  .  .  .  .  . 
808A emergency transfer panel
  .  .  .  .  .  .  .  .  . 
attendant console
 .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 
cable slack manager
.  .  .  .  .  .  .  .  .  .  .  .  .  .  . 
cables
  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 
cables between auxiliary cabinet and MDF
  .  .  .  . 
cables between cabinet and MDF
  .  .  .  .  .  .  .  . 
coupled bonding conductor wires
.  .  .  .  .  .  .  .  .