Polycom DOC2702A User Manual

Page of 1010
Polycom RealPresence Collaboration Server (RMX) 1500/2000/4000 Administrator’s Guide 
21-40
Polycom, Inc.
Enabling Hot Backup
To enable Hot Backup:
1
On the RMX menu, click Setup > Hot Backup.
The RMX Hot Backup dialog box is displayed.
2
Complete or modify the following fields: 
3
Click OK.
Using Hot Backup Triggers
Hot Backup is initiated by the slave MCU on detection of no response from the master MCU 
on a “Keep Alive” operation. The Hot Backup triggers initiates the Hot Backup swap from 
Master to Slave when the selected conditions on the Master MCU occur.
Table 21-4  
Hot Backup
Field
Description
Hot Backup Enabled
Select this check box to enable Hot Backup.
MCU Role:
This setting determines the role of the MCU in the Hot Backup 
configuration.
Select either Master MCU or Slave MCU from the drop-down menu.
Paired MCU IP 
Address
Enter the Control Unit IP Address of the:
Slave MCU (if this MCU is the Master
Master MCU (if this MCU is the Slave)
Synchronization 
Status
The status of the synchronization between the Master and Slave 
MCUs in the Hot Backup configuration is indicated as:
OK - Hot Backup is functioning normally, and the Master and 
Slave MCUs are synchronized.
Attempting - Hot Backup is attempting to synchronize the Master 
and Slave MCUs.
Fail - A failure occurred while trying to synchronize the paired 
MCUs.
None - Hot Backup has not been enabled.