Sterling SSE-5 BL User Manual

Page of 61
SSE 5 BL
Transport, Assembly and Storage 20
7.1. Transport and Packing
 
Please ensure adequate carrying capacity of the lifting
equipment.
The equipment pass a rigorous operating test in the factory and are packed carefully to avoid
transport damage.
Please check packing on delivery for transport damage.
The inlet and discharge flanges are sealed with plugs, so that no dirt can enter during transport.
Plugs must be removed before assembly.
Packing materials should be disposed of according to environmental laws or reused.
Only use for transport of the equipment a suitable  lifting device  (e. g. a fork lift truck or a
workshop crane).
Transport must be shock-proofed and free from vibrations.
7.2. Assembly
 
Please ensure adequate carrying capacity of the lifting
equipment.
Check the carrying capacity of the point of installation,
particularly if installed on a platform.
The place selected for installation should be as free of vibrations
as possible.
The main switch must be freely accessible.
Ground  the equipment against electrostatic charging.
7.3. Storage
The control system may only be stored at temperatures from -25 to +55°C (-13 to +131 °F).
Between delivery  and machine commissioning the equipment should be stored in a dry, dust-free
and vibration-free room.